TRANFOVIA(NINGBO) EQUIPMENT TECHNOLOGY CO.,LTD

Why Tranfovia

Why Transformer Manufacturers Choose Tranfovia

Founded by engineers from HEDRICH and Zhongshan Kaixuan. 90–150 day confirmed lead times. A 12-month full-machine warranty.

Our Team & Factory

Built by People Who Grew Up Inside Transformers

Tranfovia was founded by a core engineering team from HEDRICH and Zhongshan Kaixuan — engineers with decades of hands-on experience in transformer manufacturing equipment. We don't just sell machines — we deliver integrated production solutions backed by engineers who have built and run this equipment themselves.

Jessie Feng
Jessie Feng
Founder
LinkedIn
Partner factory overview
Factory machining and assembly
Inspection area
Lead Time & Delivery

Know Your Timeline Before You Sign

Production lead time is 90–150 days, confirmed in writing with every quotation — and you can follow the progress with photo and video updates throughout.

90–150 days
Production Lead Time

Machines and whole production lines. Final schedule depends on configuration and is confirmed in writing per order.

24 hours
Configuration & Quote

Send your transformer specs and receive a line configuration with a budgetary quotation within one working day.

7–40+ days
Typical Transit Time

Sea freight: 7–10 days to Southeast Asia, ~20 days to the US West Coast, ~30 days to the US East Coast, ~40 days to Europe, 40+ days to South America.

Production & Delivery Schedule

StageTimelineWhat You Get
Inquiry & configuration Within 24 hours Line configuration, layout suggestion, and budgetary quotation
Production 90–150 days Photo and video progress updates available throughout production
Inspection & testing Before shipment IEC/NEMA verification with documented test report and pre-shipment video inspection call
Shipping FOB / CIF / DAP — all supported Export-grade packing, container load planning, and full customs documentation

Lead times are confirmed in writing with every quotation. Peak-season orders and highly customized configurations may vary — your confirmed schedule is attached to the contract.

Export & Support

Supported From Order to Operation

From export packing and sea freight to installation crews on your floor — one team handles everything after you place the order.

Installation & Commissioning

1–2 engineers on-site for 10–15 days, worldwide — installation, alignment, and commissioning until the line reaches rated output. Travel and labor costs are borne by the customer.

Operator Training

Hands-on operation and maintenance training, in English, delivered by the same engineers during the 10–15 day installation period — your staff runs the line before we leave.

12-Month Warranty & 12h Response

Full-machine warranty for 12 months — covers every defect caused by the machine itself. Support responds within 12 hours; confirmed-fault spare parts ship from China in about 7 days.

Global Logistics

FOB, CIF, and DAP terms all supported. Export-grade packing, container load planning, and full customs documentation handled for you.

See Real Deliveries — Browse Our Client Cases →

Still Comparing Suppliers? Talk to Our Engineers First

Send your specs and get a line configuration with a confirmed timeline — no commitment, reply within 24 hours.

Get a Quote within 24 Hours

90–150 day confirmed lead time · 12-month full-machine warranty · 12-hour support response

Contact us to Get a Quote