Why Transformer Manufacturers Choose Tranfovia
Founded by engineers from HEDRICH and Zhongshan Kaixuan. 90–150 day confirmed lead times. A 12-month full-machine warranty.
Built by People Who Grew Up Inside Transformers
Tranfovia was founded by a core engineering team from HEDRICH and Zhongshan Kaixuan — engineers with decades of hands-on experience in transformer manufacturing equipment. We don't just sell machines — we deliver integrated production solutions backed by engineers who have built and run this equipment themselves.



Know Your Timeline Before You Sign
Production lead time is 90–150 days, confirmed in writing with every quotation — and you can follow the progress with photo and video updates throughout.
Machines and whole production lines. Final schedule depends on configuration and is confirmed in writing per order.
Send your transformer specs and receive a line configuration with a budgetary quotation within one working day.
Sea freight: 7–10 days to Southeast Asia, ~20 days to the US West Coast, ~30 days to the US East Coast, ~40 days to Europe, 40+ days to South America.
Production & Delivery Schedule
| Stage | Timeline | What You Get |
|---|---|---|
| Inquiry & configuration | Within 24 hours | Line configuration, layout suggestion, and budgetary quotation |
| Production | 90–150 days | Photo and video progress updates available throughout production |
| Inspection & testing | Before shipment | IEC/NEMA verification with documented test report and pre-shipment video inspection call |
| Shipping | FOB / CIF / DAP — all supported | Export-grade packing, container load planning, and full customs documentation |
Lead times are confirmed in writing with every quotation. Peak-season orders and highly customized configurations may vary — your confirmed schedule is attached to the contract.
Supported From Order to Operation
From export packing and sea freight to installation crews on your floor — one team handles everything after you place the order.
Installation & Commissioning
1–2 engineers on-site for 10–15 days, worldwide — installation, alignment, and commissioning until the line reaches rated output. Travel and labor costs are borne by the customer.
Operator Training
Hands-on operation and maintenance training, in English, delivered by the same engineers during the 10–15 day installation period — your staff runs the line before we leave.
12-Month Warranty & 12h Response
Full-machine warranty for 12 months — covers every defect caused by the machine itself. Support responds within 12 hours; confirmed-fault spare parts ship from China in about 7 days.
Global Logistics
FOB, CIF, and DAP terms all supported. Export-grade packing, container load planning, and full customs documentation handled for you.
Still Comparing Suppliers? Talk to Our Engineers First
Send your specs and get a line configuration with a confirmed timeline — no commitment, reply within 24 hours.
Get a Quote within 24 Hours90–150 day confirmed lead time · 12-month full-machine warranty · 12-hour support response